Project:

Raw Water Pump Station and Intake for Eagle Mountain Water Treatment Plant

Client:

City of Fort Worth

Phase 1 and Phase 2 Raw Water Intake and associated pump station for this project included gate structures and associated controls for the intake structure in the lake and pump stations. The Phase 1 pump station included two 1500HP and two 2250HP pumps. Two of these pumps are on 4160V VFDs. Phase 2 included pumps rated at 2250HP operating on 4160V soft starters. The electrical distribution at the pump station includes captive, individual transformers to provide greater reliability and operational flexibility.